Laserfiche WebLink
i ~ <br />Coulson Excavating Company, Inc. - Bonser Gravel Pit <br />Exhibit L -Reclamation Costs <br />The estimate of probable cost for reclamation is: <br />Item Description Unit Unit Amount <br />No. Cost <br />1 Subsoil replacement <br />• sedimentation pond 152,504 cu yd $0.20 $30,500.00 <br />• overburden stockpile <br />2 Topsoil replacement <br />• topsoil stockpile <br />• haul road 129,819 cu yd $0.50 $64,909.50 <br />3 Topsoil preparation and seeding 70 Ac. $692.00 $48,468.00 <br />4 Fertilization <br />• pit <br />• overburden topsoil stockpile 70 Ac. $137.50 $9625.00 <br />• haul road <br />5 Liner Material <br />• spreading <br />• moisture conditioning <br />• blending, grading, and <br />co mpact ions 11135__ __. <br />Total Estimated Cost <br />70 Ac. $ 10.00 $700.00 <br />$154,382.50 <br />This estimate dated December 2000. <br />