Laserfiche WebLink
Apr-11-00 01:14P • ~ P-OS <br />pesticide applicator. <br />• 9. To prevent the introduction of noxious weeds, all equipment mast be cleaned before it <br />is brought in tttc project area. <br />lU. A mining and reclamation plan needs to be submitted as part oCthe permit, and <br />shall he complied with. Any changes to the plan az'e subject to approval by the White <br />River Field Office Manager. <br />11. No excavation within 50 feet of pipelines. <br />12. The mined azea to he re-contoured to tl,e Fielti Manager's speciflcatiotts. The silo <br />shall be re-shaped to gentle sloping surfaces avoiding straight lines and flat surfaces. <br />No slopes shall he steeper than 3:1. Re-contouring, furrowing, tipping and seeding <br />will lie done progressively in cottjttttctiott with Utc excavation of the material. <br />14. lb verify the amount of material removed, :ut initial and Iinal survey of the pit will <br />performed by the operator and submitted to tltc Wttilc River Field Office. <br />15. To help prevent scdlmcnt transportation info the river drainage best management <br />practices will be used to control erosion. <br />• 1(,. Submit to the White River Field Uffice an annual report of the amount of material ~I <br />that has removed from the 13axter Pit. <br /> <br /> <br /> <br />