My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44203
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:39 PM
Creation date
11/20/2007 11:51:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002119
IBM Index Class Name
Permit File
Doc Date
2/26/2003
Doc Name
Adequacy Response Revised Pages
From
Elam Construction Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
before the 2002 permit conversion. This is approximately 11,800 cy. Using an average of 10 <br />inches over the remaining area to be mined of 7.2 acres yields an additional 12960 cy. As <br />described earlier, this topsoil will not be entirely stockpiled. Once an area of final grade <br />slope is prepared, some topsoil from the area in advance of the mining will be used to <br />reclaim this slope. <br />CRUSHING AND STOCKPILE AREAS -The excavated gravel resource is crushed and <br />stockpiled according to size near the mining area. Maximum processing is approximately <br />3,000 tons per day. Since a portable crusher is used, the location of the crushing operation <br />and processed stockpiles change as the mining proceeds west across the mining area. <br />Crushing operations will not occur during the winter months. Used asphalt pavement and <br />concrete rubble is also stockpiled within the mining area for future crushing. Once the <br />asphalt and concrete is crushed to its proper size, it is stockpiled for use as a recycled <br />material in new construction. Occasionally, soil that has been determined to be free of <br />debris and inert is brought to the site and stockpiled for use during reclamation efforts. <br />STAGING AREA - 1.8 acres within the permit boundary is designated as a staging area. <br />Activities that occur within the graveled surtaced area include: <br />^ Truck Scale. <br />^ Fuel Storage. <br />^ Equipment Parking and Maintenance. <br />^ Overflow Resource Stockpiling. <br />^ Lab and Tool Trailer Parking. <br />^ Seasonal Watchman's Residence (self contained R~. <br />~~~_ &~ <br />~~ ~ <br />"v - ~ ~ ;. <br />T~~ ate: <br />-~-: ~ ,...,,~.~.~ ~ _ , -~~ ~a~ <br />-~.; <br />t f <br />rw,,,, <br />!i i _ t <br />a ~~~ ~~ <br />~~ ~.: r <br />~d -* ~.~-.~.: <br />Staging Area. Note Earthen Berm and Buffer Area Along Cottonwood Gulch. <br />
The URL can be used to link to this page
Your browser does not support the video tag.