Laserfiche WebLink
l <br />• <br />The worst-case reclamation scenario (i.e., lazgest reclamation liability) occurs at the conclusion of <br />mining, since most of the Whirlwind bench and a portion of the waste embankment will need to be <br />reclaimed. The entire 0.99-acre area at the Packrat portal will need to be reclaimed. Each portion of the <br />reclamation is discussed in the sections that follow. <br />The reclamation timetable is shown in Section 2 in Table E-1 and the costs for the worst-case scenario <br />ate calculated in Exhibit L: Reclamation Costs. <br />2. Reclamation Timetable <br />The reclamation timetable below is based on the projections for the mine and the amount of <br />reclamation that is needed after mine shutdown. Once the mine is permanently shut down, the <br />• reclamation is expected to take approximately 6 months. <br />.~ <br />Whirlwind Mine June 07 E-2 <br />