My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44073
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:32 PM
Creation date
11/20/2007 11:48:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
7/2/2007
Doc Name
New Application
From
Energy Fuels Resources Corporation
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN EXHIBIT E <br />1. General Reclamation Plan <br />The total disturbed azea for this permit consists of the following areas: <br />- 19.75 acres in the main Whirlwind portal azea, <br />- 0.99 acres in the Packrat portal azea. <br />- 0.76 acres of Packrat access road. <br />- 0.64 acres at two power drop pad azeas. <br />- An additiona10.23 acres at each of two ventilation shafts in Colorado. This does not include an <br />- additional 6 ventilation shafts in Grand County, Utah, which will be permitted under Utah <br />regulations. <br />This is a total disturbed azea in Colorado of 22.60 acres. <br />• All disturbed azeas will be reclaimed to dry rangeland for wildlife habitat, which is the primary post <br />mining land use. Bat gates will be provided at the main Packrat portal to enhance bat habitat, which is <br />a desire of the Colorado Division of Wildlife and the BLM. Current plans are to backfill the Whirlwind <br />Portal during reclamation; however, a bat gate could also be instalied at that portal if requested by the <br />BLM. Map F show the final configuration of the two portal azeas. Map C-3 shows cross sections of the <br />Whirlwind site for current, mining and reclamation cases and Map C-S shows the same for the Packrat <br />portal site. <br />As discussed in the mine plan (see Exhibit D), the site will be partially reclaimed as the waste <br />embanlanent is constructed over the 10-year mine life. Initially, the outer slope of the existing waste <br />pile will be reclaimed, after it is expanded as shown in Cross section A-A' on Map C-3. As the waste <br />embankment of the pile expands to the east, the north face will also be reclaimed. Topsoil replacement <br />will be performed by dozers spreading the material over the slope, followed by seeding in either the <br />Spring or Autumn. The seed mix is presented later in this section. Final reclamation will commence at <br />the end of the mine life of approximately 10 years. <br />•~ <br />Whirlwind Mine June 07 E-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.