Laserfiche WebLink
<br />EXHIBIT E <br />(Reclamation Plan) <br />At the conclusion of mining, the site will be smoothed out, leveling <br />any deposits of sand and gravel remaining. <br />Any overburden that is available will be replaced following mining to <br />slopes not steeper than 8: 1. Topsoil that is available will then be <br />returned over the overburden, retaining the slopes no steeper than 8:1 as <br />shown above. <br />Following the final shaping, the mined area will be worked for a <br />seedbed and seeded to a cover crop of sorghum-type of forage. <br />The remainder of the site, as being within the area where the stream <br />flows during runoff seasons or during periods of flooding, will not be <br />reclaimed other than the leveling of the deposits of sand and gravel <br />previously referred to. <br />