Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILRATION /DEMOBILIZATION <br />PROJEOT IDENTIFlCATION <br />Agenry or organization name: Lorondo Divkipn O/ Minen6 And Gedogy <br />• <br />Task a: 046 State: Caroratlo PermiVOb B:C-92-081 <br />Dale: 02262003 County: ROUtt Abbrevialion:none <br />User- JRS Sile: Hayden GulU LOatlout filename: GOel-Od6 <br />Permit or other job amion: Permit Ranevra102 <br />Task tlescdptbn: Mobilize/Demobilize Equipment toy Pond Removal <br />EQUIPMENT TRANSPORT RIG COST Shia base : 1 per tlay <br />Cost data source : CRG Oa:a <br />Tmd tractor tleseriptbn : Generic on-0igbway buck na<tm, 6x4, diesel powered, d00 HP <br />Truck Vaaer tlescnpban : GenerK IdOmg goosepecx <br />Available rig capacities : <br />Cast Breaktlown: Ownership eosNwm: <br />Operatin cosMOUr. <br />Operator cosMOUr. <br />Helper eosVnour <br />Total Unit DpaMdgr: <br />NON-ROADABLE EQUIPMENT <br />Machine WeyhVunn Ovmershq HaW Rig <br />Description Ronsl CosMdunit CosMrNnil , mop vece epurpmem saner tem, am, enu ~ wp <br />0.25 Tons 2650 Tons 51• Tons <br />524.3d 526.99 533.09 <br />52B.d9 530.2] 534.34 <br />52]0] 5220] $ZLDI <br />50.00 62378 52378 <br />5]9.90 5108.11 5118.28 <br /> <br />Fle¢t SUe Haul Trip Relum Trip DOT pertnll <br />(N0. units) CosMr8leet CosMrBleet CosNleet <br />Laf D9R - 9SU 65.96 553.fi6 SnB.2B 1 5111.94 3118.28 50.00 <br />-Reveg Equipment 20.00 566.00 5]9.90 1 S/d5.90 5]9.90 50.00_ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SutAOtala: 5311.81 Sf98.18 50.80 <br />Machine <br />Description Total <br />CosMOUrNnit Fket Size <br />(NO. arias) Haul Trip <br />CosMrabet Relum Trip <br />CosMr/flee) <br />-Flatbed Truck. 6xa, 45K GVW 590.64 1 590.64 590.64 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: 590.60 590.64 <br />• <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest mot or city or fawn within prgecl area region : Cray <br />Transportation CVCle Time: Nora Total one-way travel distance: 400 miles <br /> Roatlable Readable Average travel speetl: 40.0 mph <br /> Equryment Equipment <br />Haul time lhours)= 1.00 1.00 Total non-roadable madtlemob cost': 61,66170 <br />Pelum l'vne hhours)= 1.00 1.00 -rxo rouna tops wim NW dg <br />Loafing lime (hours) = 0.50 NA Total roatlade mob/demob cost -' : 5181.28 <br />Unbading time (hours) = 0.50 NA -- ^^e rwn4 tT. ra gad rig <br />Subtotals= 3.00 2.00 <br />JOB TIME AND COST Total pbtime: 6.00 hours <br /> Total job cost : 61,849 <br />