My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43959
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:26 PM
Creation date
11/20/2007 11:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cast Estimating Sol[ware <br />PROJEOT IDEMIFlCATON <br />Agency or organization name : Corozadc Division OI Minerals Anf Geology <br />Task M: 045 Stale: Cob ado Permillpb a: C-92-OB7 <br />Date: 02/26/2003 Counry:ROUIf ADbrevialion:nCne <br />Us¢r: JRS Sile:Hayden Gukh LOafoul Filename: GOBI-D45 <br />Perms or olh¢r IoC action : Permtl Renewal0l <br />Task tleseriplion : MObiIiIB/DBmObi/%ZB £gUlOmlR110/IRlhdl RBC/amBf10R <br />EQUIPMENT TRANSPORT RIG COST Shih basis: tper day <br />Cost data source: CRG OaIa <br />Truck tractor description :Generic omhighway buck tractor. 6x4, dresel powered, d00 HP <br />Truck (railer tlescription : Generc labing gooseneck, drop tleck egvipmanl UeJer (25T. 50T, and LOOT) <br />NON-ROADABLE EDUIPMENT <br /> <br />Machine <br />Description Weigh6untl <br />(Tons) Ownership <br />CosMr/unit Naul Rp <br />Cost/nduNl Fleet Size <br />(NO. units) Haul Trip <br />CmMrAleet Return Trip <br />CosMrnleel DOT paned <br />CosVlleel <br />-Caf O9R-ASU 6596 55366 5f18.Z6 i Sflf.9a $116.26 50.00 <br />-iAMROCK OHA 6005, 40 1225 551.54 819.90 1 513t44 5]990 50.00 _ <br />-CAT f4H 20.]0 535.]2 5)9.90 1 5115.61 518.90 80.00 <br />.Caf 827G w/pusayuN 41.Oa 546.13 Sloe. f f 2 530e.41 5216.12 50.00 <br />Aeveg Equipment 20.00 566.00 5]9.90 f 5145.90 519.90 50.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Suolotals: 5813.31 55/1.20 50.00 <br />ROADABLE EOUIPMEM <br />Machine <br />Description <br />Total <br />osVhour/unit <br />Fleet Size <br />(No. units) <br />Maul Trip <br />CasMr/Ileet <br />Ralurn Trip <br />CosMrflleet <br />fuel TBnkeC 4x2, OO HP $44.64 1 $44.64 $/4.64 <br />-Flatbed Truck. 6x4, 45K GVW 590.6a 1 f9D.ba 590.64 <br />-Water Tanker. 2.500 Ga/. 539.13 1 539.13 539.]3 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals : 5f74A1 51)4.41 <br /> EQUIPMENT HAUL DISTANCE antl TM1 E <br /> Nearest ma lor city or lows within protect area region : Craig <br /> T nsponation Cvde Tme' Non- Total one-way naval distance: 400 miles <br /> Roadable Roatlable Average travel speed: <0.0 mplt <br /> Epuipm¢nl Equipment <br /> Haul lime ihaurs)= 200 1.00 Totalnon-matlable moNtlamoD cost': 56.388.64 <br /> Return time lhoural= 1.00 1.00 'Iwo r4uMtrya wan bWng <br /> Loafing lime lhours): 1.00 NA Total roatlable mob/demob cost": 5348.82 <br />• Unloading lime (houraj= LLV NA an4 rwne oo.m Nwrp <br /> $ubto1a15 = 4.00 2.00 <br /> JOB TIME AND COST Total job time : 8.00 hours <br /> Total pb cost : 56,737 <br />
The URL can be used to link to this page
Your browser does not support the video tag.