My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43959
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:26 PM
Creation date
11/20/2007 11:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 02/25/2003 <br />User : JRS <br />State :Colorado <br />County : Routt <br />Site :Hayden Gulch Loadout <br />PermiVjob# : C-92-081 <br />Abbreviation :none <br />Filename : C081-003 <br />Agency or organization name :Colorado Division 01 Minerals And Geology <br />Permit or other job action :Permit Renewa102 <br />Task description : Hegrade Facilities Area <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />• MATERIAL QUANTITIES <br />Initial <br />volume: 30,000 BCY <br />Basic machine :Cat D9A - 9SU Horsepower: 405 <br />Blade type : Semi•Universal <br />Attachment no. 1 : ROPS Cab Shitt basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />Ownership cosVhour : $53.00 NA <br />Operating cosVhour : _ $87.21 100 <br />Ripper op. cosVhour : $0.00 0 <br />Operator cost/hour : $24.01- NA <br />Total unit cosUhour : $164.22 Tetal fleet cosUhour <br />Swell Loose <br />factor : 1.250 volume <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell }actor :CAT Handbook <br />HOURLY PRODUC710N <br />Average push distance : 150 feet <br />Unadjusted hourly production : 91 D.5 LCY/hr <br />Material consistency description <br />Compacted till or embankment <br />Average push gradient : 10.00 % (~ <br />Average site altitude : 6,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />• JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.378 /LCY <br />Job Condition Correction Factors <br />Operator skill :_ <br />Material consistency :_ <br />Dozing method :_ <br />Visibility :_ <br />Job efficiency :_ <br />Spoil pile :_ <br />Push gradient :_ <br />Altitude :_ <br />Material weight :_ <br />Blade type :_ <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />Data source : (CRG) <br />$164.22 <br />37,500 LCY <br />Source <br />/.VV <br />0.48 <br />433.88 LCY/hr <br />433.88 LCY/hr <br />86.43 Hours <br />$14.193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.