My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43959
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:26 PM
Creation date
11/20/2007 11:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 02/25/2003 <br />User : JRS <br />State :Colorado <br />County : Routt <br />Site :Hayden Gulch Loadout <br />PermiUjob# : C-92-081 _ <br />Abbreviafion :none <br />Filename : C081-002 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewa102 <br />Task description : Reg~ade Rail Spui <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 80, 000 <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Ownership cosUhour <br />Operating cosUhour: <br />Ripper op.cosUhour: <br />Operator cost hour <br />Total unit cosUhour : $164.22 Total fleet cost/hour <br />Swell loose <br />BCY factor : 1.250 volume : 100,000 <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production :. 1,243.2 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 10.00 % (neg~ <br />Average site altitude : 6,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth. <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unil cost : $0.277 /LCY <br />Utilization °J° <br />$53.00 NA <br />_ $8721 100 <br />_ $0.00 0 <br />$24.07 NA <br />Job Condition Correction Factors <br />Operator skill : _ <br />Material consistency : _ <br />Dozing method :_ <br />Visibility : _ <br />Job efficiency :_ <br />Spoil pr!e : _ <br />Push gradient :_ <br />Altitude :_ <br />Material weight :_ <br />Blade type :_ <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />1.ov <br />0.87 <br />1.00 <br />0.48' <br /> <br />$164.22 <br />LCY <br />Source <br />592.42 LCY/hr <br />592.42 Lcvfnr <br />168.80 Hours <br />$27, 720 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.