Laserfiche WebLink
<br /> <br />Mr. Richard Snook <br />April 18, 2000 <br />Page 2 <br /> <br />the creek. Cleaning ou[ the creek as you discussed with me by phone is not an acceptable method. You <br />would not be able to find the sediment! Provide the dimensions of any planned stmctures. <br />EXHIBIT D -Reclamation Plan <br />Your response was satisfactory. <br />2. In your response to Exhibit C item 1 you stated that the topsoil depth is 6-9 inches and that you will salvage <br />all available topsoil. Why, in your response to this item, do you state that "5" of topsoil separately <br />stockpiled will be replaced in reclamation. Please make your two responses consistent. <br />3.. Your response was satisfactory. <br />4. Your response was satisfactory. <br />5. Your response was satisfactory. . <br />6. Your response was satisfactory. <br />EXHIBIT E -Maas <br />Your response was satisfactory. <br />2. Your answer to this item includes contour lines and a slope ratio on a new Exhibit E -Reclamation Plan <br />Map. The rntio on the pit floor is >2H: 1 V. You stated that the pit floor will be relatively Flat. Slopes of <br />>2:1 are not considered relatively flat. Tn fact this is steeper than your planned 3H:1 V or flatter slopes. <br />Please clarify this item and change the map as necessary. <br />3. See Exhibit C Item l and Exhibit D Item 2 above. <br />4. Your response was satisfactory. <br />EXHIBIT F & .1 <br />Your responses were satisfactory. <br />Please call me if you have any questions at (303) 866-4922. <br />Sincerely, <br />. ~~i~r/Y <br />Larry D. ehler <br />Environmental Protection Specialist <br />cc: James C. Stevens, DMG <br />M.bss~pmmVempU1~I000-0 B - ' nJ . W.gwq' Rev¢w - Ido d« <br />