Laserfiche WebLink
<br />Exhibit C <br />Page 2 <br />~~ <br />Item 8. No water will be used in conjunction with the gravel operation. <br />Item 9. No surface water will be• disturbed. We do not anticipate dis- <br />turbing any ground water based on the existing excavation. However, if ground <br />water is encountered, every attempt will be made to minimize disturbance. <br />Item 10: No existing water rights will be disturbed. All Colorado water <br />laws and regulations will be complied with. <br />Item 11: Once the topsoil had been removed, the gravel will be excavated <br />by usint; a dozer to push the material in a westerly direction down an existing <br />slope approximately SO-100'. The gravel will then be crushed, or screened, <br />and stockpiled at the base of the slope. The material will then be hauled <br />by trucks to the surrounding county roads, as time allows. Crushing, and/or <br />screening, plants will be used only on an average of every two to three years <br />for sho::t periods. The maximum amount of material to be processed at any <br />one time will be 15,000 cubic yards. <br />