My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43533
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:59 PM
Creation date
11/20/2007 11:36:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007003
IBM Index Class Name
Permit File
Doc Date
4/27/2007
Doc Name
Gen. Permit- Stormwater Discharges
From
CDPS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />Permit Na C(X"i-500000 <br />PART! <br />A. OVERAGE UNDER THIS PERMIT <br />Industries Covered <br />Under this general permit, the following types of facilities may be granted authorization to discharge treated process-generated <br />wastewaters and/or stormwater runoff into waters of [he state of Colorado: <br />Facilities engaged in the mining and processing of sand and gravel (including rock or stone used as aggregate), and mining and <br />quarrying of other nonmetallic minerals (except fuels orgraphite), as described by the Standard Industrial Classifecation (SIC) Code <br />14, and asphalt and concrete batch plants located a[ facilities covered under this permit. <br />a. Stormwater vs. Process water: When stormwater mixes with process water, the process water limitations (Part 1.B of the <br />permit) apply to the discharge of that mixed water. Process waters from these facilities are subject to effluent limitations <br />under 40 CFR 436. <br />b. Process Water. For purposes ofthis permit, process generated wastewaters include: <br />1) Product wash waters; <br />2) Maintenance/equipment wash waters; <br />3) Transport waters; <br />4) Scrubber waters (crushers or classifiers); <br />5) Mine dewatering (groundwater and/or runoff); <br />6) Other process water as determined by the permit issuing authority; <br />7) Stormwater runoff from mine or processing areas; and <br />8) Stortnwater runoff, which mixes with process, generated wastewater before sampling. <br />c. Stonnwater: The stormwater section (Part I.C ofthe permit) is intended to cover stormwater mnoff from those portions ofa <br />nonmetallic minerals production operation that are not subject to effluent limitations under 40 CFR 436. <br />2. Dredee and Fill Operations <br />This permit doesnot constitute authorization under 33 U.S.C. 1344 (Section 404 ofthe Clean Water Act) ofany stream dredging or <br />tilling operations. <br />3. Application Requirements <br />In order to be considered eligible for authorization to discharge under the terms and conditions of this permit, the owner, operator, <br />and/or authorized agent of any facility desiring to discharge must submit, by letter or hand delivery, two copies of the discharge <br />application form, available from the Water Quality Control Division (the "Division"), which generally requires the following <br />information: <br />a. Name, address, and descriptive location of the facility; <br />b. Name of principal in charge of operation of the facility; <br />c. Name of water receiving the discharge; <br />d. Description of the type of activity resulting in the discharge including the anticipated duration of activity and/or the <br />discharge, anticipated volume, and rate of discharge, and the source of water which is to be dischazged; <br />e. Description ofany wane water treatment system and recycle/reuse utilized; <br />f. A map or schematic diagram showing the general area and/or routing of the activity; <br />g. Analysis of the process water to be discharged; <br />h. Description ofstomtwater discharges, including drainage area; <br />i. Description of present and proposed best management practices at site, including map; <br />j. Any existing water quality data on stormwater discharges; and <br />k. Certification as to the preparation of a Stormwater Management Plan. <br />4. Application Due Dates <br />At least thirty days before the anticipated date ofdischarge, the owner (or operator ifthe owner does not operate the facility) ofthe <br />facility shall submit an application as provided by the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.