Laserfiche WebLink
iii iiuiiiiiiiii iii <br />• <br />DEAN R. MASSEY <br />Doc Date:12/11/2001 <br />PARCEL, 1'1L1UR0, HULTIN Re SPAANSTRA, P Ci. <br /> ATTORNEYS AT LAW <br /> SUITE 3800 <br /> 1901 CALIFORNIA STREET <br /> OENVE0. COLORADO 90202-2638 <br /> TELEPHONE 13031292-Ba00 <br /> iELECOPIER 13031 296-304 <br />J ~" {-e «ti~Q ~~ ~x ~~z~~qz <br /> <br />June 21, 1992 <br />i'~. DIRECT DIAL <br />~~~ R..~ ~~) 293-6509 <br />~N 3 ~ 199 J <br />~ecl mafl ~C~rd , ~'' ~ <br />s~0~2 <br />VIA TELEFAX .,,. <br />Mr. Kent A. Gorham mB`~"" <br />1313 Sherman Street Room 215 <br />Denver, Colorado 80203 <br />Re: The Rockcastle Company <br />Request for L~ctension of the June 26,,.-1990 Agreement <br />Dear MY. Gorham: <br />• Thank you for your letter of June 3, 1992 in which you summarize• <br />the current status ~of implementation of the above referenced <br />Agreement. In that letter you identified six issues which will <br />require resolution prior to commencement of earthwork at the site.yr, <br />This letter responds to your request as follows: <br />1. Access issue: Rockcastle's consultant, ACZ, has contacted the <br />manager for the current landowner (Mr. R.H. Peck, 506 Breeze <br />Street, Craig, Colorado 81625 Phone: 824-6561) and has made <br />arrangements to ensure access for your inspection activities as <br />well the, conduct of the remainder of the reclamation work. Your <br />contact for access for inspection purposes should be Jerry <br />Nettleton at ACZ (1-879-6260) during the course of the reclamation <br />activities this season. Following termination of the agreement we <br />would anticipate that you would make independent arrangements with <br />the landowner for future site inspections or work. <br />2. Existing gullies: Rockcastle will repair existing gullies in <br />excess of 12 inches during the course of reclamation work to be <br />performed this season. <br />3. Outslope of Pond 5/6: Rockcastle will ensure that the outslope <br />is constructed at a 2.5:1 slope in accordance with your <br />conversation with Tom Leidich, ACZ, Znc. <br />. 4. Topsoil markers: Rockcastle will re-establish topsoil markers <br />and/or stakes to avoid unnecessary disturbance during the course of <br />