Laserfiche WebLink
I <br /> SECTION 1.0 1998 Annual Reclamation Report <br /> As specified by the revisions (1/3/90) to 2CCR 407-2. 2.04.13; Trapper Mine is submitting an Annual <br /> Reclamation Report for the previous calendar year(1998). <br /> Historically, section 3.5.3 of Trapper's mining and reclamation permit required a reclamation map be <br /> submitted to the CDMG annually by March 15. Subsequent to 1988 the map entitled the 'Postmine <br /> Contour Map' has changed to 'Reclamation Map.' The reclamation maps developed from aerial pho- <br /> tographs taken during the previous fall shows pit advancements, recontoured spoil areas and a <br /> historical account of the previously regraded areas for the year. <br /> The 1998 reclamation map is a composite of the aerial photographs taken in October 1998, and shows <br /> the reclamation performed during 1998 for all areas under bond. Map(s) 1.0 show the aerial extent and <br /> location of mature shrub clumps, disturbed acres, graded acres, topsoiled acres and perennial seeded <br /> acres during 1998. It also shows the location, aerial extent and reclamation year of all previously <br /> revegetated areas, as well as the projected mature shrub dump establishment areas, topsoil stripping <br /> areas and laydown areas for 1999. <br /> 1.1 Permtttee Identification <br /> The Permittee for this annual reclamation report is: <br /> Trapper Mining Inc. <br /> P.O. Box 187 <br /> Craig CO 81626 <br /> Permit No. C-81-010 <br /> 1.2 Results <br /> Table 1.1 and Map(s) 1.0 show the 1998 reclamation results including areas topsoiled but not <br /> seeded in 1997. The various reclamation stages are addressed below in separate <br /> subsections. <br /> 1.2.1 Disturbed Acres <br /> In 1998, Trapper disturbed 130.71 acres resulting from topsoil salvage, haulage corridor con- <br /> struction,topsoil stockpile construction, sediment pond construction, and other miscellaneous <br /> activities as approved by the Division. <br /> 1.2.2 Back filled and Graded Acres <br /> Trapper backfilled and graded to final contour (AOC) approximately 117.21 acres in 1998. <br /> These acres were in Ashmore Pit, Hawken Pit and Derringer Pit. <br /> 1.2.3 Topsoiled Acres <br /> Trapper retopsoiled 127.29 acres during 1998 in Ashmore Pit, Hawken Pit and Derringer PR. <br /> 1.2.4 Seeded Acres <br /> There were 209.07 acres seeded to perennial species in 1998. These acres are in association i <br /> with mine pit(s) advancement.This includes the 81.78 acres laid down but not seeded in1997. <br />