Laserfiche WebLink
engineering offices house engineering and drafting personnel for the mine. These buildings have been removed from <br />• the site, and the environmental/engineering office has located in the warehouse. <br />Coal Handling/StoraQe Facilities <br />The major components of the coal handling/storage facilities include: <br />• No. SA Conveyor <br />• 48-inch Overland Conveyor <br />• Stacking Tube <br />• Primary Raw Coal Stockpile <br />• 20,000 Ton Raw Coal Stockpile <br />• Reclaim Tunnel and Conveyor <br />• Screening and Sizing Building <br />• 36-inch Overland Conveyors <br />• Raw Coal Storage Conveyor <br />• 10,000 Ton Storage Silo <br />Coal produced from the No. 6 mine is transported by a 48 inch slope conveyor through the No. SA portal to a 48-inch <br />overland conveyor. The 48-inch overland conveyor transports the coal across State Highway 13 and the Williams <br />Fork River to the stacking tube and primary raw coal stockpile. The stacking tube and coal stockpile are located near <br />the former No. 5 portal area. <br />No. SA Conveyor. Once the overland belt was put in, all coal from the No. 5 mine longwall system was transported <br />to the facilities area via the No. SA conveyor. All coal from the No. 6 mine is transferred via this same conveyor. The <br />No. SA slope conveyor leaves the No. SA portals and terminates at a transfer building which transfers the coal to the <br />48-inch overland conveyor. <br />48-inch Overland Conveyor. The 48-inch overland conveyor was constructed in 1985 to allow coal to be vansported <br />from the No. SA portals to the coal handling facility. The main obstacles in constructing the overland conveyor were <br />I) gaining permission from the DMG to come within 100 feet of a stream (namely, the Williams Fork River) and 2) to <br />gain approval from the State Highway Department to cross State Highway 13. Since no environmental harm would <br />come to the Williams Fork River, the DMG approved construction of the overland conveyor in 1985; and the <br />Highway Department approved construction across State Highway 13 in the same year. Documentation of State <br />Highway approval is presented in E.xhibi[ 19, Overland Conveyor Highway Crossing Approval. The overland <br />conveyor is covered for dust control and has been included in the RAG EC Air Emission Permit. A copy of the Air <br />Emission Permit from the Colorado State Department of Health is included in Exhibit 2, Other Required Permits. The <br />48-inch overland conveyor terminates at the coal stacking mbe. <br />Stacking Tube. The stacking tube is approximately SS feet in height and 12 feet in diameter. Coal passes through the <br />stacking tube into the 100,000 ton raw coal stockpile. <br />Primary Raw Coal Stockpile <br />The coal stockpile is designed to accommodate over 210,000 tons of run-of mine coal. The basal area of the stockpile <br />storage area is approximately 210,000 square feet. The stockpile was constructed on a previously disturbed area and <br />as such, no topsoil was salvaged. Typically, approximately 60,000 tons of coal will be stored in the stockpile. The <br />maximum capacity will be used only at times when coal production exceeds delivery schedules. Usually, this will <br />occur when the longwall system is being moved to begin another longwall panel or trains are delayed. The CDOH air <br />• emission permit will dictate the maximum tonnage in the coal pile and DMG approved footprint. <br />30,000 Ton Raw Coal Stockpile. The coal stockpile was designed to accommodate 30,000 tons of run-of--mine coal. <br />It was located in the No. 9 Mine porthole. This coal was trucked from the primary raw coal stockpile or SA This is <br />1~~~~vf~~ {'Si~i~ 1 J [iii ~ <br />MidTerm Responce 2.05-9 ~~.~~ Revised 12/05/01 <br />