Laserfiche WebLink
EY.IliBLT C • <br /> RECLAMATION FLAW <br />The road surface materials will be pushed into piles, with a D-8 <br />caterpillar and will then be screened with a colenran screener. <br />The materials will either be loaded into dump trucks or stock- <br />piled. The mining will begin at the westernmost boundary and <br />proceed easterly until all materials are removed from the site. <br />The rained area will be leveled when all road base material is <br />reniuved. The area after mining, will be relatively flat, as nrirr- <br />irrg will take place only to a depth of ten (10') feet. Tlie liigfr- <br />walls, as a result of the removal of the. ten (10') feet, will be <br />sloped to, no greater than, 2:1. After all materials have been <br />removed, revegetation will take place in accordance with the seed- <br />ing methods. <br />GUIDE SHEET FOR PASTURE. HAY AIJD RAt1GE SEEDING <br />SEEDING PLANS: <br />Cins <br />Field No's: 1/ FOR THE SOIL BORROW AREAS <br />Species Suggested Varieties Amounts-Pounds/Acre <br />P <br />PLANNED <br />GRASSES <br />AND LEGUMES <br />Indian rice grass 3.0 lbs <br />Nester wheatgrass 4.0 lbs <br />Sand dropseed .5 lbs <br />Yellow sweet clover 2.0 lbs <br />PLANNED SEEDING DATES: Upon completion of all nrininy. <br />FERTILIZATION RECOMMENDATIONS: None at this time. <br />SECD BED PREPARATION RECOMMENDATIONS: Disc harrow or drag to remove <br />old weed cover, if~necessary, and prepare a suitable seed bed as in <br />normal farming operations. <br />SEEDING EQUIPMENT PLANS: Use a suitable drill, if possible. [f <br />broadcasted double the above rates. <br />OTHER POINTS: (Specify LRA, irrigated, dry, or range, seed bed, <br />depth of seeding, etc.) Drill to a depth of 1/2 inch. If broad- <br />casted harrow or rake to cover seed. <br /> <br />