Laserfiche WebLink
<br />EXHIBIT - D Reclamation Plan <br />1. This pit will have only one stage of reclamation. At <br />completion of quarring the waste rock will be placed at <br />base of pit walls to be used in sloping. Walls will be <br />sloped 9:1 or flatter. Topsoil will be placed per Soil <br />Conservation specifications. All reseeding will comply with <br />Soil Conservation. Affected area will revert back to <br />rangeland with no structures on site. <br />Page 6 <br />l <br />