Laserfiche WebLink
<br />aiPP.-1'?-?4 PION 03:5. PM ECI LAN DSCRPE 39.i 27c^ 1611 <br />• • <br />BCI LANDSCAPE CONTR.AC~'ORS, INC. <br />~ 4 FXHiRiT D - Recamation Plan <br />(a) BCI plans to quarry 1-2 mine pits at a time. Before eve <br />would start to mine another pit eve would begin the reclamation <br />process of the completed pit. Therefore, at any one time during <br />our mining there will be approximately .5 acres of quarry area to <br />reclaim. As stated in EXHIBIT C - Mining Plan the quarry pits <br />are already open so there will be very little overburden during the <br />mining process. The over burden or waste xock that is produced <br />we will stockpiled use to help fill in the quarry pit for <br />reclamation: sec=d <br />~C <br />=~ ~ <br />_~~ ~ aT~. <br />V ll r_t t l <br />__c_~.._ <br />~._-L <br />I~rev;ovsl ~; s-~urbecl s~-fe <br />fir} door ~ ',~--~1oor' <br />% -i e rec.-1a=~ rw ~ <br />...... _- <br />{b) The slopes of the quarry walls will be stable and left in <br />a configuration that is consistent with the previously disturbed <br />walls. The fuaished pit will look very similar to today. The <br />difference is that the pits will be 10-20 feet wider and 20-30 feet <br />deeper, which will make the pit walls taller. The pit walls are <br />consistent with the surrounding landscape and would not cause <br />any problem for future rangeland. <br />Pre-Mining Post Reclamation <br />.w--~.. <br />-=~ PfiWc~i (s-I~.l~~~ pl~Wc~U C~l> <br />--:-:> <br />_ .._=- ,~ <br />_ :-- .~.-..____~,~w~c1-.level - ~ -I - ~ .. <br />~.=. ~" <br />7 <br />U <br />P . 9 <br />1A~IP <br />