My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42834
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42834
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:16 PM
Creation date
11/20/2007 11:19:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006078
IBM Index Class Name
Permit File
Doc Date
12/15/2006
Doc Name
Fax- Adequacy Response #3
From
Hart Environmental
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM HRRT ENUIRONMENTRL PHONE N0. <br />i9 <br />HART ENVIRONMENTAL <br />303 402 9049 <br />P.O. Box +3oa Boulder, (_'olorudo rfoaoe Pho++e: aol.aaa.hho~ <br />Dec. 15 2006 03:45PM P2 <br />L)ecember 15, 2006 <br />Mr. Chris Rowe <br />Colorado Division of Reclamation, Mining & Safety <br />1313 Sherman Street, Room 213 <br />Tlenver, CO 80203 <br />Re: Adequacy Review Response # 3-Camenish Borrow 111 Special Operations <br />Reclamation Applic~tioa (File No. M-2006-078) <br />near Chris: <br />RECEIVED <br />DEC 15 2006 <br />Division of Raclemation, <br />Mining and Safety <br />This letter was written in response to the lhvisiom's comments and request for <br />additional information contained in your letter to me dated December 14, 2006. <br />The proposed setbacks for significant man made sfauctures are as follows: <br />Structure <br />1. L.G. Everest flirt Road <br />2. Golding Ditch <br />3. iGsrr MsGee Gas Well <br />4. Buried Gas Line <br />Minimum Setback <br />40 feet <br />100 feet <br />100 feet <br />40 feet <br />NOTE: All setback distances are measured from the top of the excavation to the <br />specific structure. <br />The Division should disregard any suggestion that the slope of the excavation will <br />be 3:1. As stated in the Divisions December 14, 20061etter, mining will be at a 1:1 or <br />steepen angle with a 3:1 slope created through the installation of a compacted pit liner as <br />shown on the Reclamation Plan Thawing (sheet 2 of 2). <br />Wtllnuds &a~king <br />uuhanmrryl Mnnngrnirnt <br />Gwd Use f'Innni+N <br />Rxlurnn+imi Dtsign <br />PmniVliag r Lwrmg <br />
The URL can be used to link to this page
Your browser does not support the video tag.