Laserfiche WebLink
Permanent Reclamation. Approximately 13.7 acres in the northern portion <br />• of the scraper mining area will be permanently reclaimed. Upon completion <br />of backfilling, grading, and topsoiling, the area will be available for <br />revegetation activities. Prior to seeding, the seedbed dill be prepared <br />with a heavy duty off-set disk to reduce surface compaction and excessive <br />cloddiness. Contour ripping will be carried out if an inordinate level of <br />spoil/topsoil compaction is evident. Seed hlix No. 1 (Southern Exposures <br />and Drier Sites), along with a light cover crop of 10-15 PLS lbs/acre of <br />wheat or barley will be seeded on the areas to be permanently reclaimed. <br />Seeding will be done in the spring (approximately June 1 cutoff date) if <br />site preparation is complete, or after August 15 if site preparation is to <br />be completed in the summer or fall. Supplemental forb and shrub seed will <br />be that which was specified in the Seed Mix approval request to Steve <br />Renner dated February 5, ].9E7. <br />• <br />• <br />7 02/13/87 <br />