Laserfiche WebLink
<br />4. Discuss the operators plan to use fertilizer and mulch during <br />revegetation activities. <br />Exhibit H - Wildlife Impacts <br />1. We have forwarded a copy of the application to the Division of <br />Wildlife for their review and comment. We will discuss their <br />comments with you when they are available. <br />Exhibit L - Reclamation Costs <br />Your proposed phasing scheme seems reasonable; however, some of the <br />figures may be in error. We have developed new calculations for your <br />review. <br />Assume: <br />Worst case situation - 15 acres excavated <br />- 15 additional acres stripped of topsoil <br />- 12 acre plant site (including roads) <br />a. 15 acre excavation area: <br />(assume that the 15 acre area is the first phase mined, thus <br />exposed shoreline will be about 3,233 feet) <br />8ackfill - mine to <br />- fill to <br />1H: IV (27 vertical) <br />3H:IV (15 vertical) <br />21H:V (12 vertical) <br />haul (500') <br />dump <br />roughgrade <br />Total = 78,670 cubic yards x f .80 % ubic yards = 562,935.73 <br />Shoreline plants - reasonable estimate; be sure that the number <br />of plants corresponds to your response to <br />Ex E, #3. <br />Tentative total = 54,500 <br />Topsoil redistribution -assume - 3,233 lineal feet x <br />- 40 feet strip along shore <br />(3.0 acres) <br />- 10 inch depth <br />- (4,033 cubic yards) <br />- 500' haul <br />- medium scraper <br />- cost = S .76/cubic yards <br />Total = 4,033 yd3 x E .76 = 53,065.10 <br />