Laserfiche WebLink
<br />Disturbance Costs $297,510 <br />Contractor Mob/Demob (8%) 23,800 <br />Overhead (18.5%) 59,442 <br />Administrative (5%) 2,972 <br />TOTAL PROPOSED FINANCIAL WARRANTY <br />Disturbed Acreage 59.6 <br />Financial Warranty per Acre $6,438.32 <br />$383,724 <br /> <br />rnnnbe Pi! <br />DMG I l1 Perrnir <br />Pnge 33 of 46 <br />