Laserfiche WebLink
~- 4 <br />No water will be used or contact in this operation. No chemical agents of any type will be <br />used in this operation. <br />Measures will be taken to minimize any possible disturbance to the hydrologic balance <br />by exposing on minimal amount of surface area at any given time. Area will be sloped at <br />3:1 or less as mining continues, and a fast growing seed applied to stabilize the azea, if <br />needed, until reclamation begins. The area is flat and porous enough to slow run off from <br />any precipitation. <br />The primary commodities will be sand and gravel with no secondary commodities mined. <br />EXHIBIT D <br />Reclamation Plan <br />Reclamation of the area will be on going with sloping of the site at 3:1 or less as areas of <br />the pit are mined out. Overburden will be stockpiled along with topsoil for use in <br />reclaiming the area. Seeding of a fast growing seed such as Prosso millet may be use to <br />help stabilize the slopes until seeding commences with the recommend plan by the <br />N.R.C.S. (see attached sheet). <br />There will be no building or ponds left on the property after reclamation and the land will <br />be returned to rangeland. <br />Efforts to maintain the hydrological balance will be to minimize the amount of exposed <br />surface as mining moves from south to north, slope areas to 3:1 or less, and the soil is <br />porous and should absorb any normal precipitation. <br />Any area that is planted with the recommended seed mixture will be disked and seed <br />applied as recommended by the N.R.C.S. to include any recommended augmenting prior <br />to planting. <br />EXHIBIT F <br />A.P.E.N permit is the only other permit required and will be applied for. <br />