My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42439
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42439
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:55 PM
Creation date
11/20/2007 11:10:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
NPDES PERMIT
Section_Exhibit Name
EXHIBIT 33
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Na. COG-850000 <br />Facility No. COG-850036 <br />Page /a <br />• Outfall D01 shall be the discharge of final treated water prior to entering the Illinois River. E¢luent limitations are <br />specified below and in Part I. B.1.6) and cJ. <br />Ptunmeter Limitation Rationale <br />Flow, MGD Report Design Capacity <br />Sealeabfe Solids, mP/P 0.5* c/ Federal BAT <br />pH, s. u. 6.5-9.0 a/ Water Quality Standards <br />Oil and Crease. me/P 10 c/ State ERluent Reeulations <br />a/ Minirnwn-Maximum <br />b/ 30-Day Average/Daily Maximum <br />c/ Daily Maximum <br />* 7Tu discharge may be eligible for an exemption from this limitation if it is demonstrated that the discharge occurred <br />as a result of precipitation greater than the associated )0 year, 24 hour event. See permit, Part /. B.I.dJ. <br />The permittee is encouraged to read the general rationale for an understanding of how this permit was developed and to <br />read the pernut to see what requirements exist. Within the body of the permit itself, monitoring requirements are specified <br />in Part L8.3.6), the Stormwater Management Plan requirements are specified in Part I.B. 2. and notiftcatian requirements <br />for eJJluent violations are addressed in Part II.A. <br />• Sulittity (7DS) monitoring ojthe discharge will not be required, as shown in the table above. Phosphorus monitoring <br />ojthe discharge wiU not be required. <br />Certification: Bared on the above information, Kerr Coal Company is certified to discharge from the Kerr Loadoru under <br />the general pemtit for coal mining, identified as permit nwnber COC-850000. AU correspondence relative to this facility <br />should reference the specific facility number, COG850036. <br />!on C. Kubic <br />May 14, 1997 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.