Laserfiche WebLink
Page 2 of 2 • <br /> <br />Listed is a table of the projected reclamation costs for Phase 3 <br />ITEM DESCRIPTION QUANTITY UNIT UNIT AMOUNT <br />NO. RATE ' <br /> RIP PIT FLOOR FOR ~, 85 ACRE $150.00 <br /> COMPACTION $1,177.50 <br />2 SPREAD TOPSOIL 3" 7 Brj ACRE <br /> THICK ON SLOPES AND <br />PIT FLOOR 3186 CUBIC <br />$1.50 <br />$4,749.00 <br /> (AVG HAUL < 700 LF) YD <br />3 SEEDING 7.85 ACRE $500.00 $ 3,925.00 <br /> <br /> SUBTOTAL $ 9,851.50 <br /> ADD PROFIT & 10% $ 985.15 <br /> OVERHEAD <br /> TOTAL $10,836.65 <br />