Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />• <br /> <br />~I ~ N. Reclamation Plan <br />Table of Contents <br />2.05.4 Reclamation Plan <br />2.05.4(2)(a) Timetable <br />2.05.4(2)(b) Reclamation Cost Estimates <br />2.05.4(2)(c) Backfilling and Grading <br />2.05.4(2)(d) Topsoil (redistribution) <br />2.05.4(2)(e) Revegetation <br />2.05.4(2)(f) Disposal of Debris, Acid-Forming and <br />Toxic-Forming Materials <br />2.05.4(2)(g) Sealing or Managing Mine Openings, <br />Exploration Holes, Other Boreholes or Wells <br />2.05.5 Post-Mining Land Uses <br />Doc Date:1 211 112 0 0 1 <br />IV-1 <br />N-1 <br />IV-3 <br />IV-3 <br />IV-5 <br />IV-8 <br />IV-16 <br />IV-16 <br />N-17 <br />• <br />