Laserfiche WebLink
1a2a/2oo2 <br />Table A-1. Facilities Removal Calculations Page 5 of 5 <br />• <br />Fleet Cost <br />Operation & Overhaul <br />Equipment OwnershiF Equipment Attachmen Operator Total <br />CAT D10R $70.80 $112.14 $13.01 $30.65 $226.60 <br />For ripping facilities area: <br />D10N - 1500 BCY/Hour: $ 226.60 <br />Seismic Velocity: 5000 FPS <br />Conditions: Average-Ideal <br />Operator Factor: 0.80 <br />Efficiency Factor: 0.83 <br />Adjusted Production = 996 BCY/Hour <br />Unit Cost = $ 226.60/Hr. X 1 Hour/996 BCY = $0.228/BCY <br />f. J <br />• <br />FACILRMV f <br />(a fad/~ 3 <br />