Laserfiche WebLink
1o/zsizooz <br /> Table A-1. Facilities Removal Calculations Page 4 of 5 <br />. FACILITY/STRUCTURE UNIT QUANTITY UNIT EXTENDED ESTIMATED <br /> COST COST COST <br /> <br /> MISCELLANEOUS STRUCTURES fcontinue dl <br /> ANFO Silos(total) and Emulsion Tank <br /> SWdures Cu. Ft. 10,940 $0.19 $2,079 <br /> Concrde Sq. FL 1,162 $3.33 $3,869 <br /> Footings Feet 52 $8.50 $442 <br /> Disposal Cu. Yd. 66 $5.44 $359 <br /> $6,749 <br /> Explosive Storage <br /> Magazine (3 [Drag Cu. Ft. 2,560 $0.19 $486 <br /> Trailer (magazine) Cu. FL 2,560 $0.19 $466 <br /> Storage Bldg. Cu. Ft. 15,120 $0.19 $2,873 <br /> (pde constructlon) <br /> Fence Feet 620 $1.78 $1,104 <br /> $4,949 <br /> Dragline Repair Pad (Queen Anne in B/C Pit) <br /> Concrete: <br /> Flatwork (Queen Anne Erection Pad) Sq. Ft. 4,900 $3.33 $16,317 <br /> Disposal Cu. Yd. 121 $5.44 $658 <br /> $16,975 <br /> SUB-TOTAL (MISC. STRUCTURES) $38,267 $38,000 <br /> MISCELLANEOUS ITEMS <br />• Radio laver (skid-mounted) Each 1 $580.00 $580 <br /> Scrapyard & Storage Cu. Fl. 84,000 $0.19 $15,960 <br /> Pdes and Ughting Each 20 $63.75 $1,275 <br /> Waste Drum Disposal <br /> Non-Hazardous Waste 55 Gal. Drum 19 $297.50 $5,653 <br /> Buried U81i8es -Disposal Lump Sum 1 $2,318.00 $2,318 <br /> Rip fadli8es area - D10N BCY 80,667 $0.23 $18,392 <br /> SUB-TOTAL $44,178 $44.000 <br />SUB-TOTAL ALL FACILITIES (far items listed above) <br />AREA ADJUSTMENT FACTOR: 1.12% (for items listed above) <br />TOTAL FACILITIES (for items listed above, based on 1997 costs) <br />$1,235,000 <br />$14,000 <br />$1,249,000 <br />Dragline Repair Pad (Molly Brown in D-Pit) <br />Concrete: <br />Flatwork (Erection Pad: 70'x70'x8" reinforced) Sq. FL 4,900 $5.01 $24,549 <br />Flatwork (Transformer Pad: 15k15k4" plain) Sq. Ft. 225 $2.27 $511 <br />Disposal Cu. Yd. 124 $5.44 $675 <br />Rairoad Track Panels: <br />Rempva! (Erection Pad) L.F. 140 $6.52 $913 <br />Removal (Erecton Pad) L.F. 484 $6.52 $3,156 <br /> $29,803 $30.000 <br />Area Adjustment Factor (for Mdly Brain site): 6.5°h $1,937 $2,000 <br /> <br />SUB-TOTAL (Mdly Brav Tub ErecBon Site, based on 1998 costs) 831,740 $32,000 <br />GRAND TOTAL FACILITIES REMOVAL $1,281,000 <br />• <br />FACa.RMV <br />[Ff3a%3 <br />