1 <br />1 <br />EXHIEIT C -MINING FLAN <br />Mining is intended to commence late this summer or early fall and <br />is expected to last lU years. <br />' Growth medium will be stripped at a 6 inch depth, stockpiled, and <br />redistributed at a 6 inch depth during reclamation. Growth medium that <br />is stockpiled for more than one growing season will be sloped ~(H):I(V) <br />and seeded with a fast growing vegetative cover to minimize wind and <br />water erosion. Growth medium stockpiles will be free from distubance by <br />ongoing operations - the locations are shown on the mining plan map. <br />' There will be no overburden stockpiles. The area to be mined is <br />viirtually a sand deposit. All materials excavated will be transported <br />' from the site (excluding growth medium). <br />The sand deposit is appro::imately 25 feet deep. MIning is not <br />t expected to e>:ceed this depth. <br />A maximum of 70.UUU tons/year of sand will be mined from this <br />open-pit sand operation. Earthmoving will be conducted using 25-ton <br />' trucks, end-loaders, belly-dumps, and graders. <br />The permit area is generally a hillside, about 25 feet high. The <br />' hill will be mined, graded, and contoured to merge with the surrounding <br />land area and elevation. Please refer to the mining and reclamation <br />plan maps. <br />' No more than 3 acres are expected to 6e disturbed at any one time. <br />This will include mining, loading, and hauling. As mining progresses, <br />disturbed areas will be reclaimed so that the three acre area will not <br />' be exceeded. <br />This will be a dry mining operation. Groundwater is not expected <br />' to be encountered. The only water requirement for operations is for <br />haul road dust Suppression. Water will be trucked to the site. <br />There will be no materials processing on-site. Following removal <br />' of the sand, it will be transported from the site. <br />The existing acces road and its dimensions are shown oon the mining <br />' plan map. This road will adequately serve operations - road <br />improvements are unnecessary. <br /> <br /> <br />1 <br />