My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42345
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:50 PM
Creation date
11/20/2007 11:06:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Rockfill Embankment Specifications, 5th Street Road
Section_Exhibit Name
NH2 1996 Section 2.05.3(3) Attachment 2.05.3(3)-7
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assessment of conditions for recommended construction specifications <br />• was based on preliminary design information supplied to us by Westem <br />Fuels-Colorado, our general understanding of the project, and our <br />experience with similar projects. <br />This report is not an investigation of embankment foundation condi- <br />tions and assumes that the foundation conditions aze as portrayed to us <br />by Western Fuels. This report does not deal with surface water issues <br />relating to operation of the 007 pond or culvert design through the <br />embankment. <br />1.2 ACKNOWLEDGMENTS <br />Recommendations for construction specifications for the rockfill <br />embankment were developed under the guidance of Michael W. West, <br />Ph.D., P.E. Proposed specifications were prepazed by James D. Gill, <br />P.E. This report was prepazed by Mr. Gill and was reviewed by Dr. <br />West. Project data were supplied by Mr. Tod Lefevre, Mine Engineer, <br />Western Fuels-Colorado (New Horizon Mine). <br />u <br />Z. SITE CONDITIONS AND PROPOSED CONSTRUCTION <br />The embankment traverses the 007 pond at the New Horizon Mine. We <br />assume the pond will be pumped down so that construction will take <br />place under dry conditions. Western Fuels has indicated that water <br />could rise up on both sides of the embankment to an elevation 5650 feet <br />during a 25-year, 24 hour flood event. Primary and secondary culverts, <br />designed by Westem Fuels will be constructed in the embankment to <br />allow for passage of surface water through the embankment and to <br />reduce any differential hydrostatic head across the embankment. <br />Culvert design is beyond the scope of this report. <br />The proposed rockfill embankrent will be approximately 950 feet long <br />with a finished crest width of 35 feet. Total depth of fill will range <br />from 15 to 20 feet with 3h:ly side slopes. An unpaved road on the top <br />• 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.