Laserfiche WebLink
<br />8. Within sixty (60) days of acceptance of the Regional Director's approval <br />of the minor modification to the Mining and Reclamation Plan, the Company <br />shall either demonstrate that none of the water entering the 30 inch culvert. <br />drains from a disturbed surface, or apply to the regulatory authority for, and <br />be granted, a'small acreage exemption, or route the water from the 30 inch <br />culvert through a sediment pond. Until one of the above is accomplished, the <br />Company shall institute temporary sediment control measures for the water <br />entering the 30 inch culvert such as placing straw bales at the entrance to <br />the culvert. <br /> <br />• <br />