My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42254
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:46 PM
Creation date
11/20/2007 11:04:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Stipulations to Minor Modification on Rec Plan
Section_Exhibit Name
APPENDIX X Section X.1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulations <br />for <br />Minor Modification <br />to <br />Mining and Reclamation Plan <br />/•~ '~ <br />Hawk's Nest West Mine ~, <br />t <br />\ ' <br />1. The parking lot area shall be regraded so that any runoff that would have <br />accumulated on top of the fill will be diverted back towards the road. A 1-~r <br />detailed regrading plan shall be submitted to the regulatory authority to that <br />effect within thirty (30) days of acceptance of the Regional Director's ~~~~ <br />approval of the minor modification to the Mining and Reclamation Plan. <br />2. The engineer's report on the stability of the parking lot fill shall be ~o <br />submitted to the regulatory authority within five (5) days of its receipt by <br />the Company. If the engineer's report shows that the parking lot fill is <br />unstable, Western Slope Carbon, Inc. shall submit plans to stabilize the <br />parking lot fill. <br />(3. The en ineer's certification of the sediment ' <br />g pond shall be submitted to ~/-„ <br />-,•~ the regulatory authority within five (5) days of its receipt by the Company. <br />~ ~ 4. Within thirty (3) days of acceptance of the Regional Director's approval <br />~~ of the minor modification to the Mining and Reclamation Plan, the Company , <br />,,,~ <br />shall submit to the regulatory authority the elevation of the sediment pond's <br />emergency spillway. <br />15. Within thirty (30) days of acceptance of the Regional Director's approval <br />~1 of the minor modification to the Mining and Reclamation Plan, the Company <br />shall submit to the regulatory authority calculations demonstrating that all :. ~~^` <br />culverts and ditches are correctly sized. <br />J 6. Within thirty (30) days of acceptance of the Regional Director's approval <br />of the minor modification of the Mining and Reclamation Plan, the Company <br />shall submit to the regulatory authority drawings or sketches of the retaining <br />walls to be built above portals U3•, 04, and 115. <br />-~ <br />,/ 7. The Company shall revise the revegetation seed mix to exclude Yellow Sweet <br />Clover. <br />i;, , . <br />~h. ' <br />v <br /> <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.