Laserfiche WebLink
• The unit-train facility consists of the following structures, as shown <br />on the Loa dout Facilities Map, Drawing D-2-2. <br />(1) Truck Dump and Hopper <br />(2) Conveyor C-1 <br />(3) Loadout Control Building <br />(4) Railroad Spur <br />(5) Locomotive Warming Shed <br />(6) Personnel Building <br />(7) Freeze Protection Storage Tank <br />(B) Water Wells <br />Roads <br />Utility Corridors <br />Buildings and Structures <br />(1) Truck Dump and Hopper <br />• The truck dump arrangement is shown on Drawing D-2-2. This system is <br />designed with a back-up-to-dump truck hopper of 60-ton capacity with a <br />vibrating feeder under the hopper feeding a 30-inch wide, 500 tph <br />conveyor. <br />The hopper is constructed of a stiffened mild steel plate lined with <br />abrasion resistant liners, and is sized to hold 60 tons of coal at 50 <br />pounds per cubic foot. <br />The hopper support structure is constructed of structural steel shapes <br />anchored to concrete footings. There are access stairs from the top <br />of the dump to the loadout floor area; and there is an access platform <br />of bar grating around the cutoff gate. <br /> <br /> <br />4-23 <br />