Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : p48 <br />Date <br />User <br />11/08/2006 <br />JRS <br />Cost Breakdown <br />PermiUjob#:C-1981.012 <br />Abbreviation :none <br />Filename : C012-048 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Partial Phase I Bond Release SL-02 <br />Task description : Regrade West Portal Containment Area 1 <br />HOURLY EQUIPMENT COST <br />• MATERIAL QUANTITIES <br />Initial <br />volume : 3,340 <br />CIRCES Cost Estimating Software <br />State :Colorado <br />County :Las Animas <br />Site :New Elk Mir <br />Basic machine :Cat D9R - 9SU (2005) <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization % <br />Ownership cost/hour : $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosVhour : $32.78 NA <br />Total unit cosUhour : $204.53 Total fleet cosVhour <br />$204.53 <br />Swell Loose <br />CCV factor : 1.125 volume : 3,758 LCY <br />Source of estimated volume :Exhibit 19; Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted frll orembankment <br />Average push gradient : 0.00 % (I <br />Average site altitude : 7, 500 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factors <br />Operator skill :_ <br />Material consistency <br />Dozing method :_ <br />Visibility :_ <br />Job efficiency <br />Spoil pile :_ <br />Push gradient: <br />Altitude :_ <br />Material weight :_ <br />Blade type <br />Net correction :~ <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />Source <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.80 <br />1.00 <br />1.00 <br />0.87 <br />1.00 <br />0.39 <br />483.43 LCY/hr <br />483.43 LCY/hr <br />HB) <br />::.: _ - , <br />JOB TIME AND COST "~ "' ~ ~~ ~~~ ~~ <br />• Fleet size : 1 Dozers) Total job time : 7.77 Hours <br />Unit cost : $0.423 /LCY Total job cost : $1,590 <br /> <br />