Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLD02ER WORK <br />PROJECT IDENTIFICATION <br />Task # : 047 <br />Date : 11/08/2006 <br />User : JRS <br />Agency or organization name :Colorado Division Of Minerals And G <br />Permit or other job action :Partial Phase 1 Bond Release SL-02 <br />Task description :Regrade Pond 008 and Rip and <br /> HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cosUhour : $204.53 <br /> MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume : 28,300 CCY factor : 1.125 volume : 31,838 LCY <br /> <br /> Source of estima ted volume :Exhibit 20; Table 23 <br /> Source of estimated swell factor :CAT Handbook <br /> HOURLY PRODUCTION ~ ~ ~ Job Condition Correction Factors Source ~~~ <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 125 feet Material consistency : 0.90 (Cat HB) <br /> Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (lshifr/day) <br /> Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.79 (Cat HB) <br /> Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br /> Average site altitude : 7,500 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2,650 Ibs/LCY Net correction : 0.31 <br /> Weight description <br /> Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 322.96 LCY/hr <br /> Adjusted fleet production : 322.96 LCY/hr <br /> :.. <br />JOB TIME AND COST <br /> Ffeet size : 1 Dozers) Total job time : 98.58 Hours <br />• Unit cost : $0.633 /LCY Total job cost : $20,183 <br />State :Colorado <br />County :Las Animas <br />Site :New Elk Mine <br />PermiUjob# : C-1981-012 <br />Abbreviation :none <br />Filename : C012-047 <br /> <br />