Laserfiche WebLink
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,900 pounds/LCY Struck volume : 14.00 LCY <br />Material description : Heaped volume : 20.00 LCY <br />Decomposed rock - 50% Rock, 50% Earth Average volume : 17.00 LCY <br />Rated payload : 48,000 pounds Adjusted capacity : 16.55 LCY *** <br />Payload capacity : 16.55 LCY "` howdy production reflects volume per scraper pair on push-pull models <br /> <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper loading time * : 0.40 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 0.830 (Cat HB) <br />' loatl time per scraper pair on push-pull models Net correction : 0.830 0.830 <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 625 -25.00 5.00 -20.00 960 0.85 <br /> <br /> <br /> <br /> <br />• <br />Haul time : 0.85 minutes <br />Return route <br />minutes <br />"travel time for each segment is adjusted for acceleration/deceleration. RetUfn time : 1.08 <br />