Laserfiche WebLink
sheetl oft <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :Colorado Division Or Minerals And Geology <br />014 State :Colorado Permitlob # :C-1981-012 <br />11/08/2006 County :Las Animas Abbreviation :none <br />JRS <br />Permit or other job action :Partial Phase 1 Bond Release SI-02 <br />Task description :Rip and Spread Cover Material on RDA <br />,: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />• Cost Bre <br />Scraper work team -Scraper :Cat 627G <br />-Push dozer :Cat D9R - 9SU (2005) <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck :Water Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrapei2 dozer NA NA NA miscbuk <br />Utilization-machine : 100 55 NA NA NA 25 <br />-Ripper attachment: NA 20 NA NA NA NA <br />Ownerhip cost/hour : $56.90 $64.72 NA NA NA $21.78 <br />Operating cost/hour : $116.80 $54.12 NA NA NA $8.36 <br />Ripper op.cosUhour: NA $0.00 NA NA NA $0.00 <br />Operator cost/hour : $24.95 $32.78 NA NA NA $34.24 <br />Unit subtotals : $198.64 $151.62 NA NA NA $64.38 <br />Number of units : 2 1 0 0 0 1 <br />Group subtotals : Work : $548.90 Support : $0.00 Maintenance : $64.38 <br />Total work team cosUhour : $613.28 <br />MATERIAL QUANTITIES <br />Initial Swe11 Loose <br />volume : 99,150 BCY factor : 1.250 volume : 123,938 LCY <br />Source of quantity take-off :Map 24; Page 2.05-21; Operator and Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />Site :New Elk Mine <br />Filename : C012-014 <br />~X Z ~ ,Q-3l t~~i3~ 6 s~oZ <br />