Laserfiche WebLink
CIRCES Cost Estimating Software <br />• BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado PermiUjob# : C-1981-012 <br />Date : 11/08/2006 County :Las Animas Abbreviation :none <br />User : JRS Site :New Elk Mine Filename : C012-002 <br />Agency or organization name :Colorado Division Of Minerals And Geo/og. <br />Permit or otherjob action :Partial Phase I Bond Release SL-02 <br />Task description : Backfill and Grade West Portal Area <br /> HOURLY EQUIPMENT COST <br /> Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> OperatingcosUhour : $98.84 100 <br /> Ripper op.cosUhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $204.53 Total fleet cosUhour : $613.60 <br /> MATERIAL QUANTITIES ~~ <br /> Initial Swell Loose <br /> volume : 11,760 CCY factor : 1.125 volume : 13,230 LCY <br /> <br /> Source of estima ted volume :Map 17 <br /> Source of estimated swell factor :CAT Handbook <br /> <br /> HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br /> Unadjusted hourly production : 700.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (1 shiff/day) <br /> Compacted fill orembankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.90 (Cat HB) <br /> Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br /> Average site altitude : 7,500 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight : 2, 650 Ibs/LCY Net correction : 0.35 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />• Fleet size : 3 Dozers) <br />Unit cost : $0.832 /LCY <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />~X Z 8 g ~6 11~3~06 SL O L <br />