My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42054
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:35 PM
Creation date
11/20/2007 11:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/6/2007
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• N <br /> PROJECT IDENTIFICATIO <br /> Task # : 001 <br /> Date : 11/08/2006 <br /> User : JRS <br /> <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />• Fleet s¢e : 3 Dozers) Total lob Lme <br />Unit wst : $0.832 /LCY Total lob cost <br />EX 2~ f3-lS' <br />State :Colorado <br />County :Las Animas <br />Site :New Elk Mine <br />Agency or organization name : Colomdo Division Of Minerals And Geology <br />Permit or otherjob action :Partial Phase I Bond Release SL-02 <br />Task description :Backfill and Regrade East Portal Area <br /><:. <br /> <br />HOURLY EQUIPMENT COST <br /><. <br /> Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> Operatingcost/hour : $98.84 100 <br /> Ripper op.cosUhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $204.53 Total Fleet wstmour : $813.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 127,350 CCY factor : 1.125 volume : 143,269 LCY <br />Source of estimated volume :Map 17 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />Compacted fill orembankment <br />Average push gradient : 5.00 % (l <br />Average site altitude : 7,500 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />PermiUjob#:C-1981-012 <br />Abbreviation :none <br />Filename : C012-001 <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.90 <br />1.00 <br />0.87 <br />1.00 <br />0.35 <br />245.95 LCY/hr <br />737.85 LCYIhr <br />194.17 Hours <br />$119 142 <br /> l///~b(o SLOZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.