Laserfiche WebLink
C~ <br />IX. VEHICLE HAIIL ROADS <br />CONTROL OPTIONS FOR VEHICLE HAIIL ROADS <br />(DO NOT WRITE IN THIS BECTION) <br />1. Watering (specify) times/day, to maintain moist surface. <br />2. Chemical stabilization <br />(according to manufacturer's specifications) <br />Specify: <br />a. Frequency of application and <br />b. Type of stabilizer (brand name, or composition) <br /> <br />3. Paving to be completed by <br />4. Gravel <br />(date). <br />(LIST HAIIL ROAD CONTROLS IN TBE APPROPRIATE BPACEB BELOW) <br />* Transport of coal mine waste from temporary stockpile to gob pile. <br />A. TRANSPORT OF RAW MATERIAL FROM REMOVAL BITE TO 8TOCICPILE <br />• <br />Distance (one way) 9.6 miles <br />If stockpile is off site, give distance from removal site to mine <br />entrance <br />Haul vehicle capacity 10 cubic yards No. of wheels 10 <br />Average vehicle speed 10 m.p.h. <br />Maximum vehicle speed 20 m.p.h. (cannot exceed 30 m.p.h) <br />No. of trips per day ~n (100 days oex year) <br />Haul road silt content (if known) $. <br />List controls for raw materials transport: (see measures listeQ above) <br />Proposed controls 4ravel, waterin4 2-3 times/day o maintain <br />moist surface <br /> <br />8 <br />