My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42007
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:33 PM
Creation date
11/20/2007 10:59:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/15/2002
Section_Exhibit Name
Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />C~ <br />• <br />VIII. FINISHED PRODIICT <br />A. LOADING INTO FINISHED PRODIICT BTOCRPZLE <br />Method of loading in (front-end loader, conveyor, etc.) <br />conveyo r <br />If conveyor is used, what is maximum drop height? 170 ft. <br />Loading schedule: 1zOn tons/hour 20 hours/day 260 days/year <br />Proposed controls fully enclosed silo <br />Controls for loading to stockpile include other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, <br />reduced drop height, telescoping chute <br />B. FINISHED PRODIICT STOCKPILE *fully enclosed silo <br />Maximum tons stored at one time 6 100 tons. <br />Length of time pile remains undisturbed n a <br />Proposed controls: (check appropriate boxes) <br /> <br /> <br />^x <br />Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />Chemical stabilizer (applied according to manufacturers <br />specifications). <br />Compacting of piles, method _ <br />Enclosures: .~_i~olnplete, or partial (check one) <br />Revegetation, (length of) time till revegetation ) <br />Other (specify) <br />No control <br />moist materi <br />C. LOADING OIIT FRO![ BTOCKPILE FOR FINAL TRANSPORT <br />Method of loading out (front-end loader, conveyor, etc.) <br />truck <br />If conveyor is used, what is maximum drop height? ft. <br />Loading schedule: tons/hour ~~~~~~ hours/da tin days/year <br />Proposed controls moss material, ~escoping chu~e <br />Controls for loading out of stockpile include Water injection, <br />chemical dust suppressants, bag collectors, other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppresants, <br />reduced drop height, telescoping chute. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.