My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42007
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:33 PM
Creation date
11/20/2007 10:59:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/15/2002
Section_Exhibit Name
Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />D. LOADING OIIT FROM RAW MATERIAL STOCKPILE: *temporary gob pile and <br />coal stockpile <br />Method of loading out (front-end loader, conveyor, etc.) <br />coal=r:n~veyor; gob-front end loader and trucks <br />coalLoadinq schedule: 1200 tons/hour 19___ hours/day ~Fn days/year. <br />Proposed controls for loading to stockpile: -. oa1._£n1:ty en~lnsPd _ <br />Controls include: no control, water sprays, total exposure, partial <br />exposure, moist material, other (specity) *gob controls-moist material, <br />*gob loading schedulee' 10~ tons/hoot 8 hours/day .100 days/year .' <br />VI. PROCESSING - <br />Will processing (i.e., crushing, screening, etc.) occur on site? <br />© Yes ^ No (check one) <br />NOTE: ALL PROCESS EQIIIPMENT REQIIIRES A SEPARATE PERMIT APPLICATION AND <br />APEN (SEPARATE FORM I8 ATTACHED AT END OF THS FORM - MARE ADDITIONAL <br />COPIES AS NEEDED). <br />Material loaded into processing equipment by: <br />Conveyor X ~ Front end loader Other <br />• CONTROLS FOR PROCESSING iNCLIIDE: Moist or wet materials (apeaify <br />moisture ~ it kaovn), water spray bars, bag filters, other <br />Capacity), no control. If existing processing equipment will be <br />relocated from another location complete the following sections. <br />This equipment moat already be permitted. <br />(LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES HELOW) <br />A.' PRIMARY CRIISRING <br />Maximum tons crushed per year .963 ,.n0.0.. tons. <br />Maximum tons crushed per A~F d,1_ 9630 tons. <br />Hours of crushing per day 20 hours. <br />Proposed controls (see above) moist material (approx. 8.68), water spray <br />bars <br />H. SCREENING/CLASSIFYING <br />Maximum tons screened per year 1,950,000 tons. <br />Maximum tons screened per #~>1' 19,500 tons. <br />Hours of screening per day ZO hours. <br />Proposed controls (see above) water spray bars, moist material <br />C. SECONDARY CRIISHING <br />. Maximum tons crushed per year X475,000 tons. <br />Maximum tons crushed per ~X 4 7F0 tons. <br />Hours of crushing per day 2~- hours. <br />Proposed controls (see above) moss ma erial (8.68), water spray bars <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.