Laserfiche WebLink
• <br />V. RAW MATERIAL <br />A. REMOVAL <br />MATERIAL ROCK COAL roc~cH/ cox <br />Tons removed per year 2,000,00 <br />Maximum tons removed per day 2 <br />Equipment used for removal conveyor <br />Equipment capacity (in tons) 1200 TPH <br />Est. hours per year required for removal 5200 <br />Is material drv, moist, or wet? wet <br /> <br />Specify moisture content if known ($) typicall <br />H. LOADING IN TO RAW MATERIAL STOCKPILE <br />• <br />Method of loading in (truck bottom dump, front-end loader, etc.) <br />conveyor <br />Loading schedule: 1200 tons/hour 2u hours/day 260 days/year <br />Proposed controls for loading to stockpile: mcv;ct material <br />Controls include: no control, water sprays, total enclosure, partial <br />enclosure, chemical suppressants, reduced drop height, telescoping <br />chute, other (specify) <br />C. RAW MATERIAL BTOCRPZLE *gob pile and coal .stockpile <br />*coal stockpile includes reject pile <br />• <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />gob <br />Maximum tons stored at any one time 60,000 1500 <br />Length of time pile remains undisturbed na 1 week <br />Proposed controls for rax material stockpile: (check appropriate boxes) <br />^ Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />^ Chemical stabilizer (Type: ). <br />^ Compacting of piles, method <br />^ Enclosures: complete, or partial (check one) <br />® Other (specify) moist-material <br />^ No control <br />4 <br />