My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41987
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:32 PM
Creation date
11/20/2007 10:58:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
3/20/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate TR44
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HOURLY PRODUCTION sheet 2 of 2 <br />• Hauttn Capacity <br />Suaper Payload (weight) Basis : ~ Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 14.00 LCY <br />Material description : Heaped volume : 20.00 LCY <br />Earth -Dry packed Average volume : 17.00 LCY <br />Rated payload : 48, 000 pounds Adjusted capacity : 17.00 LCY'"' <br />Payload capacity : 18.82 LCY "' nouM produdbn reBecb vdume per scraper pair on pusMpull models <br />Cycle Tlme : Job Condition Corrections : Site akitude (ft.) : 6,100 <br /> Scraper Push dozer Source <br />Scraper loading time' : 0.90 minutes Akitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />'bad 6me per scrper pair on push-pull models Net correction : 0.830 NA <br />Travel time <br />Road condition description :Rutted tlirt little maintenance, no water, 2" tin; penetration <br />Haul Route <br />u <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 1,000 12.00 5.00 17.00 650 1.55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />" Vavel time for earn Segment is adjusted for aaeleration/deceleration. <br />lade velocities are max. aroinabb par torsi resistance snovm, na average <br />Haul time : 1.55 minutes <br />Return time : 0.41 minutes <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.46 minutes <br />Unadjusted unit produdiorVhour : 589.39 LCY/hour "' Adjusted for job conditions : 489.20 LCYlttour <br />C+ptimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single suaper team (unit) houdy production : 489.20 LCYRtour <br />Adjusted multiple scraper team (fleet) hourly pradudion : 489.20 LCYRtour <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) <br />Total job time : 31.97 Hours <br />Unit cost : 50.838 /LCY Total job cost : x13,080 <br />
The URL can be used to link to this page
Your browser does not support the video tag.