Laserfiche WebLink
sheet 1 of 2 <br />I • <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Sa/ety <br />174 State :Colorado Permitllob # : C 199&083 <br />11/022006 County :Delta Abbreviation :none <br />JRS Site :Bowie No. 2 Mine Filename :C083-174 <br />Permit or otherjob action :Technical Revision 44 <br />Task description :Replace Topsoil hom Stockpile E to Gob Pile <br />;; <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer : A <br />Support equipment -Load area :~IVA <br />-Dump area :~A <br />I <br />Cost BrE <br />Road maintenance-Motorgrader <br />-Water truck :i1VA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $60.47 NA NA NA NA NA <br />Operating cost/hour : $119.18 NA NA NA NA NA <br />Ripper op. cosf/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $204.60 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $409.20 Support : $0.00 Maintenance : $0.00 <br />Total work team cost hour : 5409.20 <br />volume : 13, 900 CCY factor : 1.125 volume : 15,638 LCY <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />• Source of quantity take-off :Appendix A <br />Source of estimated swell factor :CAT Handbook <br />