Laserfiche WebLink
lorado Division of Minerals and Geol <br />IMATING FORM -SCRAPER W <br />TASK IDENTIFICATION: <br />task no.: 006 re . b GRS ermit no.: M-99-006 <br />date: 04/22199 lile name: M006-006 mine name: Kurtz <br />rmll action: New a 1. <br />task tlescri lion: Traci B Plant Sde <br />HOURLY EQUIPMENT COST: <br />coon WELD labor zone: 1 ahiaa/tla : S <br />EQUIPMENT DESCRIPTIONS: <br />acre r team: <br />CAT 615C with ROPS cab <br />road maintenance: motor radar: _NA <br />wekrtruck: NA <br /> <br />COST DATA: SCRAP <br />acre r ER TEAM <br />dozer a ROAD MA <br />radar INTENANCE <br />wHer truck <br />Ilk name: 615C-ROP NA NA <br />utilization: 100°a NA NA NA <br />cost I hour: ownershi $74. I5 N/A_ NA NA <br />o ratio 54.2_6 N/A NA NA <br />operator: 523.13 N,~A NA NA <br />untt subtotals: 101.55 <br />team subtotals: 101.55 _ <br /> TOTAL W ORK TEAM CO 101.55 <br />MATERIAL QUANTITIES: <br />De Innin volume: 29282 CCY material swell lector: 1 125 <br />cubic ertl volume: 2 2 2 CiCY final volume: 2 42 LCY <br />source of volume li ore: Ex I <br />sourx of swell labor: na <br />HOURLY PRODUCTION: <br />SCRAPER CYCLE TIME: <br />sera r loatlin lima min.: 0.9 JOB CONDITION CORRECTION <br />atte altitude tt.: FACTORS: <br />5500 <br />maneuver 8 a reatlin time min.: 0 7 attitude atl ustment: 1. <br />travel time' (haul 8 retumJ: 'ob ettieienc lactor: 0.63 <br />haul route: net ob co rroblon lector: 0.83 <br />road <br />ae . no. length <br />K. grade <br />rea. % rolling <br />rea. X lokl <br />rel. velocity <br />m travel time <br />mlrlYtae <br />1 500 0.00 5.00 5.00 1443 0.59 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />return route: haul time: 0.59 <br />1 500 0 00 5.00 Q 2405 0.45 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />'15181ast seg. atll. for acoelerauoNdaceleralion return time: 0.45 <br />total c cle time: 2.64 <br />MACHINE PAYLOAD: <br />mat. wet ht Ibaac 2550.00 MACHINE VOLUME: <br />struck a el le <br />N/A <br />mat tlex.: Ea_rih ~ D_ry pacA2~ heaped capactty (Icy): 16.00 <br />rated a load Ibs : 38 400 avers era aci Ic 16.00 <br />a load volume Ic 75.06 ~ atl'ustetl volume Ic 15.06 <br />UNADJUSTED HOURLY PRODUCTION PER SCRAPER OR PUSH-PULL PAIR LCYMR : 342.26 <br />ADJUSTED 'ob eontlition corrections HOURLY UNIT PRODUCTION LCYMR : 284.07 <br />ADJUSTED HOURLY FLEET PRODUCTION LCYmr: 284.07 <br />JOB COST: <br />FLEET SIZE: 1 sera er s TOTAL JOB TIME hours 775.96 <br />UNIT COST /LCY: 0.357 TOTAL JOB COST: 77 776 <br />