My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41953
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41953
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:30 PM
Creation date
11/20/2007 10:58:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999006
IBM Index Class Name
Permit File
Doc Date
4/22/1999
Doc Name
FAX COVER-
From
DMG
To
BRAD JONES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
foredo Division of Minerals and Geol <br />IMATING FORM -SCRAPER W <br />TASK IDENTIFICATION: <br />task no.: 007 re . b GRS ermit no.: M-99-006 <br />tlata: 04/22/99 file name: M006-007 mine name: Kurtz <br />rmle anion: New a I. <br />task tlescri lion: TO 5011 iI 510 BS <br />HOURLY EQUIPMENT COST: <br />coun :WELD labor :one: 1 ahitts/tla S <br />EQUIPMENT DESCRIPTIONS: <br />acre r teem: <br />CAT 615C with RO_ PS cab <br />road maintenance: motor ratlar: NA_ <br />water truck: NA <br /> <br />COST DATA: SCRAP <br />scra r ER TEAM <br />tlozer a ROAD MA <br />radar INTENANCE <br />water (ruck <br />rile name: 615C-ROP NA NA <br />utlllratlon: 100%o NA NA NA <br />Coat I hoar: aWrlMahl : 0 <br />y,24. 15 NiA _NA_ NA <br />o ratio : .554.26 N/A NA NA <br />operrnar: 523.73 N/A NA NA <br />unit aubtotela: 1 1.55 _ _ <br />teem subtotals: 101.55 _ <br /> TOTAL WORK TEAM CO 101.55 <br />MATERIAL QUANTITIES: <br />be innin volume: 8873 CCY material arrell lector: 7.725 <br />cubic era volume: 8 873 CCY final volume: 9 82 LCY <br />source of volume li re: Ex._L <br />aourae O/swell lector: nd <br />HOURLY PRODUCTION: <br />SCRAPER CYCLE TIME: <br />scra rloatlin time min.: 0.9 JOB CONDITION CORRECTION <br />alto altitude A.: FACTORS: <br />550_0 <br />maneuver 8 s reatlin lime min.: 0.7 ekitude atl'ustment: 1.00 <br />bevel time' (haul 8 returnl: 'ob efficient factor: 0.83 <br />heal route: net'ob correction laclor: 0.83 <br />roe0 <br />ae . no. length <br />k. grade <br />res. X rolling <br />res. X totel <br />res. X velocity <br />m travel time <br />minu4a <br />1 660 0.00 5.00 5.00 1443 0.72 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />return route: haul time: 0.72 <br />1 660 0.00 5.00 5.00 2405 0.54 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />' ISI 81ast seg. adj. for acceleratiONtleceleration return time: 0.54 <br />total c cle time: 2.86 <br />MACHINE PAYLOAD: <br />mat. wei ht Ibsllc 2550.00 MACHINE VOLUME: <br />struck ca ci Ic N/A <br />met tlex.: Earth ~ O,ryP.._acA?g heaped capacity (Icy): 16.00 <br />rated load IDs : 38 400 evere a ce eci Ic 16.00 <br />e loatl volume Ic 15.06 ea'usted volume Ic 15.06 <br />UNADJUSTED HOURLY PRODUCTION PER SCRAPER OR PUSH-PULL PAIR LCYMR : 315.91 <br />ADJUSTED 'ob contlition cortections HOURLY UNIT PRODUCTION LCY/HR : 262.20 <br />ADJUSTED HOURLY FLEET PRODUCTION LCYIhr : 262.20 <br />JOB COST: <br />FLEET SIZE: I scra e s TOTAL JOB TIME hours 38.07 <br />UNIT COST /LCY: 0. B7 TOTAL JOB COST: 3 866 <br />
The URL can be used to link to this page
Your browser does not support the video tag.