My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41946
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41946
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:30 PM
Creation date
11/20/2007 10:58:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
5/4/2007
Doc Name
Annual Operating Plan 2007 Methane Drainage Project Panels 16-24
Section_Exhibit Name
Exhibit 80 Drilling Activities - MR342
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
location in relation to topography. These hole designations for these 11 wells aze noted <br />as follows: <br />MDW Drill Hole No. <br />1-21-38 <br />3-21-36 <br />4-21-32 <br />7-21-22 <br />8-21-IS <br />9-21-IS <br />10-21-11.5 <br />MCC Federal Lease Number <br />COC-56447 <br />COC-56447 <br />COC-56447 <br />COC-56447 <br />COC-56447 <br />COC-56447 <br />COC-56447 <br />1-18-42 <br />2-18-41 <br />3-18-40 <br />4-18-35 <br />PRE-DRILLING ACTIVITIES <br />FEE <br />FEE <br />FEE <br />FEE <br />MCC incorporates by reference the Forest Service Decision Notice dated May 31, <br />2002, titled Coal Methane Drainage Project Panels 16-2-0 Mountain Coal Company West <br />Elk Mine. <br />Prior to any construction or drilling activities, an on-site inspection of proposed <br />drill sites and access routes will be conducted with representatives from appropriate <br />regulatory agencies to discuss site-specific concerns. Appropriate Road Use and Special <br />Use permits will be obtained prior to use of US Forest Service roads. <br />USFS District Ranger will be notified at least 24 hours before any construction or <br />drilling equipment is mobilized into the project areas. An authorized representative of <br />MCC will supervise all construction and drilling activities. A copy of the Annual <br />Operating Plan and all pertinent permit documents will be available from the company <br />representative for nispection. Any proposed changes in the Annual Operating Plan will be <br />reviewed and approved with the appropriate regulatory agencies before changes take <br />effect. <br />In accordance with the Conditions of Approval, Administrative ~2, the staging <br />areas to be used by the drilling contractor will be reviewed with and approved by the <br />USFS District Ranger or designated representative prior to use. These sites will be used <br />in a manner to minunize damage to the vegetation and soil. Any surface disturbance to <br />these sites will be re-graded and seeded to facilitate rehabilitation. <br />Access to all drill sites will use the roads and trails approved in the Decision <br />Notice. All access routes will be maintained to accommodate 4X4 pickup trucks and a <br />drilling unit. A drilling unit is comprised of or part of the following equipment: truck <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.