Annual Operating Plan 2007 Methane Drainage Project Panels 16-24
Section_Exhibit Name
Exhibit 80 Drilling Activities - MR342
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-18-40 USFS-West Flatiron 9 7/16/2007 7/24/2007 <br />4-18-35 USFS-West Flatiron 9 7/25/2007 8102/2007 <br />7-21-22 Mine Property 12 8/02/2007 8/14/2007 Includes 3 da. Mobe <br />8-21-18 Mine Property 9 8/15/2007 8/2312007 <br />9-21-15 Mine Property 9 8/24/2007 9/01/2007 <br />10-21-11.5 Mine Property 9 9/02/2007 9/10/2007 <br />Delays due to mechanical breakdowns, inclement weather, hole conditions, <br />operational requirements, and permit approval are not represented in the schedule. MCC <br />intends to utilize one drill rig to complete this schedule. <br />WATER SUPPLY SYSTEM <br />MCC will install and maintain a water supply system to provide water to the drill <br />sites and for dust suppression. This system will minimize, to a large degree, the need for <br />water skidders and water trucks to travel the temporary roads. The water supply system <br />will include, but is not limited to, flexible hosing, rigid piping, water pumps, and storage <br />tanks. <br />MCC will install the water supply system prior to, or as soon as possible after the <br />construction of the drill pads. The hosing and/or pipes will be placed along side of <br />existing roads wherever practical. The lines will be anchored to prevent damage due to <br />surging in the lines. Flexible hosing will be laid out cross-country to minimize total line <br />length and/or to maximize operational efficiency of the system. The cross-country route <br />would be from the Shaft Canyon Road to the reclaimed 14-07 pad. <br />The main waterline system will continue to utilize the existing portion of the road <br />above the Sylvester Gulch airshafts and will follow the proposed route of the Shaft <br />Canyon Road up to drill pad 24-08 and cross-country up the ridge to the 14-07 pad and <br />thence along this road to the West Bench Road to tie-into a portable water tank at the 22- <br />04 pad site and from there out the West Flat Iron Extension to 18-40/18-42 pad. Pumps <br />may also be situated at the 22-04 site to distribute the water to service the LM-140 rig if <br />needed. <br />Water for drilling the Box Canyon wells 7-21-22 thru 10-21-10.5 would be <br />pumped from the North Fork of the Gumuson via flexible hosing up to the well sites via <br />lines extended in 2006. <br />The projected waterline, pump, and water tank locations are provided on the <br />attached Map 3. MCC will identify and mark the waterline alignments prior to installation <br />for review and approval by the responsible USFS representative. <br />STAGING AREAS <br />MCC will utilize existing drill pad locations for staging azeas. The staging areas <br />will allow MCC to temporazily store equipment and supplies used in the drilling and <br />venting programs, and to store materials required for the continuing reclamation of past <br />drill sites and roads as well as the interim reclamation of new roads as they are developed. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.